Current Requests for Bids

Request for Proposal (RFP)
ADA Compliance Remodel – Four Rivers Vector Control District Office

Issued by:
Four Rivers Vector Control District (FRVCD)
56478 Solar Drive
Bend, OR 97707

RFP Release Date: October 22, 2025

Proposal Due Date: November 21, 2025, no later than 5:00 PM (PST)

1.         Project Overview

Four Rivers Vector Control District is requesting proposals from licensed contractors with proven experience in Americans with Disabilities Act (ADA) compliance projects.  The project consists of remodeling the FRVCD office located at 56478 Solar Drive, Bend, OR, to ensure accessibility in accordance with ADA standards.

The selected contractor(s) will be responsible for design, permitting, construction, and compliance verification.

2.         Scope of Work

The project will include, but is not limited to:

  • Accessibility Ramp: Install a new ADA-compliant ramp with handrails and appropriate slope/landing dimensions.

  • Main Entrance/Exits:  Insure main door and any exits meet ADA requirements.

  • Restroom Access: Remodel restrooms to ensure ADA accessibility, including but not limited to door width, grab bars, sink access, and maneuvering clearance.

  • Permitting: Apply for and obtain all required Deschutes County permits prior to beginning work.

  • Compliance: Ensure all modifications meet current ADA standards and applicable state/local codes.

  • Additional Projects: Contractor shall submit recommendations for additional required projects to ensure the public meeting space meets ADA requirements.

  • Site Work & Safety: Maintain a safe worksite and coordinate with FRVCD to minimize disruption to operations.

  1. Requirements􀁸

  • All contractors must hold relevant licenses and insurance.

  • Contractor required to apply for, obtain, maintain and comply with all local and state permits.

  • Work hours will be limited to 8:00 AM to 6:00 PM Monday through Friday, unless prior approval is obtained.

  • The contractor must complete all work within the mutually agreed upon project timeframe. Regular progress updates shall be provided to the District Manager, who serves as the Project Coordinator, to ensure timely completion and coordination.

  • Work with District on design elements.

4.         Contractor Qualifications

Interested contractors must provide:

  • Proof of current Oregon contractor’s license.

  • Certificate of insurance coverage (general liability & workers’ compensation).

  • Proof of bonding.

  • Demonstrated experience with ADA compliance projects (include project examples).

5.         Proposal Submission Requirements

Proposals should include the following:

  • Company name, contact information, and primary project manager.

  • Proposed approach and timeline for completion.

  • Itemized cost breakdown (labor, materials, permits, fees, etc.).

  • Detailed cost estimate (materials, labor, permitting, contingencies).

  • References for at least two similar ADA compliance projects.

6.         Proposal Deadline

  • Proposals must be received no later than 5:00 PM (PST) on October 31, 2025.

  • Submissions must be mailed or hand delivered to:

Four Rivers Vector Control District (FRVCD)

c/o Board of Trustees
56478 Solar Drive
Bend, OR 97707

Envelope must be sealed and labeled with “ADA Bid for Board of Trustees Only”

7.         Evaluation Criteria

Proposals will be evaluated based on the following criteria:

  1. Experience & Qualifications (30%)

    1. Relevant experience in design-build project management

    2. Proven track record with ADA-compliant renovations

    3. Licensing, insurance, and bonding

  2. Project Approach & Timeline (25%)

    1. Understanding of the project scope

    2. Realistic and efficient project schedule

    3. Strategy for securing permits and ensuring compliance

  3. Cost Proposal (20%)

    1. Itemized breakdown of costs

    2. Competitive pricing and cost efficiency

    3. Justification for proposed costs

  4. References & Past Performance (15%)

    1. Positive feedback from past clients

    2. Successful completion of similar projects

  5. Compliance & Sustainability Considerations (10%) (Optional but valuable)

    1. Adherence to all ADA, local, state, and federal regulations

    2. Sustainable construction practices, if applicable.

8.         Additional Information

Proposals will be reviewed by the Four Rivers Vector Control District.  The contract will be awarded based on best overall value, not necessarily the lowest bid.  Final award is subject to the District’s Board of Trustee’s approval. 

  • FRVCD reserves the right to accept or reject any or all proposals.

  • FRVCD is not responsible for costs incurred in preparing responses to this RFP.

  • A site visit can be arranged by appointment; please contact FRVCD at: (541) 880-4791

Contact Information:
Four Rivers Vector Control District
Email: fourriversvectorcontrol@gmail.com | ☎ (541) 880-4791

Surplus Equipment Available

The Board of Trustees has authorized the disposal of equipment and vehicles that are no longer used by the District.  These items will be listed here and available for the public to make offers.  We will be posting these items soon!

Pick-Up Truck 1

More info to come.

Pick-Up Truck 2

More Info to come.

Passenger Van

1998 Dodge Power Wagon. More Info to come.

UVL Fogger 1

1980-ish LECO truck mounted fogger.

UVL Fogger 2

1980-ish LECO truck mounted fogger.

©2025 by Four Rivers Vector Control District. Proudly created with Wix.com

bottom of page